Operation and Maintenance of the Elastic Vibrating Rapper
For the problems that tend to arise when the equipment is in use, engineers of Hunan Darui Heavy Machinery Co., Ltd. offer the following suggestions:
1. Once installation is complete, inspect the whole machine first; then operate it by hand and rap several times, and only after the machine runs without faults start the motor to rap and put the equipment into operation.
2. Rapping is generally done one machine at a time, but rapping can also be carried out on several working surfaces at the same time; every rapper rapping once makes one cycle. The rapping programme, rapping time and rapping cycle can be set manually or automatically.3. After a new machine has been running in for half a month to a month, the lubricating oil of the gear reducer must be replaced once.
4. The vibration produced by rapping loosens and detaches fasteners and causes equipment faults, so the machine must be patrolled often and fully re-tightened at least once a week; particular attention is needed at the following points:
① the nuts and bolts that secure the anvil head and the spring washers;
② the bolts in the hexagonal socket holes that fix the stop block;
③ the bolts that fix the force-transfer part.
5. The brass bushes on the chain and the main shaft must be lubricated often with an oil pot.
6. Clean the dust from every part of the equipment.
7. Wear parts: because the work is intermittent and the load is not heavy, the parts have a long life; from years of supply experience a small stock of clamps, chains, stop blocks, force-transfer rods and torsion springs can be kept as spares.